
ARTUS guarantees value
Overview of services


Nationwide your competent partner

ARTUS operates in the field of professional surface repair of damaged high-quality coatings and surface modification as a “problem solver.”
Since 2005, we have continuously developed various solutions to ensure that the ideal repair method is chosen for the specific damage concerning technology, material, and craftsmanship.
- Customer service assignments for daily individual orders
- Project assignments for repair teams of 2 to 20 repair technicians
- Damage repair at manufacturer level with permanently employed specialists
- Completion of time-critical damage repairs before and after acceptance
The final locations for the respective deployment areas can vary depending on the assignment. Our repair technicians are based nationwide.
Innovative product development

Through our self-developed product combinations, we have the capability to repair damage at the borderline, which is superior to the standard materials available on the market.
- Experience from over 120,000 repair assignments
- Operative Excellence –
The strive to always give the best - Continuous optimization of our materials and procedures
- Individual solution development – repair possibilities
Innovative Product Development
Over the years, we have acquired extensive knowledge of all types of repair materials. We work with the latest process techniques and use self-developed product combinations that are superior to the standard materials on the market. This allows us to repair any surface optimally. We achieve results that qualitatively exceed the state of the art and technical standards.
For complete coatings, for example, we do not just “paint” damaged trades but lacquer or patinate them at manufacturer level in the installed state. Whether it is paints, varnishes, or fillers – we can produce almost any color for any surface so that the repair blends in optically and is not recognizable as such.
The utility value of the object is restored 100%
Our technicians can adjust the color tone, which deviates from its original shade due to various manufacturers, weather influences, UV radiation, or cleaning, so that it blends harmoniously into the surface.
Additionally, with our system, we can perfectly adapt to the requirements of on-site lacquering in terms of application behavior, viscosity, and drying time.
We live environmental protection. Therefore, we guarantee that all products we use are free of harmful substances:
| Free of | |
|---|---|
| – | Formaldehyde |
| – | Vinyl Chloride |
| – | Chlorinated polycyclic compounds |
| – | Azo dyes |
| – | Fluorochlorocarbons |
| – | Wood preservatives |
| – | Heavy metal additives |
“HE SERVICE OF SURFACE REPAIR IS ONLY PERFECTED THROUGH EXPERIENCE.”
— CEO Thomas Grant
-
Attrition
-
Bleaching, Breaches in paint, Bumps, Burglary traces
-
Chafe marks, Color changes, Color varieties, Cracks
-
Decomposition, Dents, Drilling holes, Differences in gloss level, Drag marks, Dullness
-
Fire damage, Fugues
-
Holes
-
Loss of use
-
Pollution
-
Stains, Scratches, Spalling, Split-off, Swelling
-
UV-Bleaching
-
Water damage
And many damages more.
New Construction, Luxury Hotel Munich
900 hours
Doors, frames, and furniture
Federal Court, Karlsruhe
1.150 hours
Windows
New Airport Construction, Pier Frankfurt
1.600 hours
Post-and-beam façade, door leaves, frames, industrial floor
Cruise Ship, Netherlands & Bahamas
1.000 hours
Wall claddings, doors, floors, furniture, room fittings
New Residential Quarter in Frankfurt
1.800 hours
Facade parts, apartment entrance doors, interior doors, windows
Prison in Willich, Correctional Facility in NRW
1.000 hours
Powder-coated windows and door frames, window sills
Office Building, Hafencity Frankfurt
450 hours
Steel frame doors
New Construction, Pharma Corporation Ulm
2.250 hours
Interior facade elements
New Construction, Office Complex Kanzlerplatz Bonn
1.500 hours
Aluminum doors, interior doors, partitions, glass panes
Cruise Ship, Netherlands
1.500 hours
Wall claddings, doors, floors, furniture, room fittings, revolving doors
Penthouse Terrace, Hafencity Hamburg
60 hours
For large plant troughs
Barracks in Karlsruhe
175 hours
Stone staircase Terrazzo
Various Super-Yachts, Domestic & International
900 hours
TouchUp
New Construction, Hotel Munich
1.000 hours
Hotel room doors
New Headquarter Construction, DAX Corporation Hannover
900 hours
Post-and-beam façade
New Construction, Office Complex in Cologne
1.200 hours
Doors, windows, post-and-beam façade
W&W Kornwestheim, Corporate Headquarters or Office Building in Kornwestheim (near Stuttgart)
2.300 hours
Wood façade/window elements
T-Rex, High-rise in Frankfurt am Main
4.000 hours
Facade, doors, frames, stone/wood floors
SPIN Tower, High-rise Complex in Frankfurt am Main
800 hours
Columns, facade, doors, frames
Hotel in Düsseldorf
700 hours
Wall claddings, furniture, doors
pRED, Office Building for a Pharmaceutical Corporation in Basel
400 hours
Anodized partitions, facade, floor
Novo Novartis in Denmark, Pharmaceutical Corporation in Denmark (Kalundborg)
250 hours
Doors, frames, baseboards, wall claddings
University of Mainz
375 hours
Doors, frames, wall tiles
FOUR, High-rise Complex with 4 Buildings in Frankfurt am Main
800 hours
Doors, frames, façade, aluminum doors
Clinic in Erlangen
6.350 hours
Wall Shells high gloss white / Cleanroom areas
Radio house in Paris
3.050 hours
Wood panels
Hotel in Hamburg
2.400 hours
Refurbishment of mirrored anodized covers
Office building in München
1.677 hours
Pole-bar-facade in DB 701
Housing area in Dresden
1.600 hours
Hardwood floors, cork flooring, skirting boards in several apartments
Pharmacy building in Penzberg
1.480 hours
Ceiling boards and Pole-bar-facade in RAL 9006
Lingerie-outfitter in London
Active maintenance agreement 1x per quarter year – 10 commissions x 105 hours till now
Selling rooms
Hotel in Mallorca
1.000 hours
Nature stone plates in 36 hotelrooms
Residential building in Köln
944 hours
Room doors and frames in 80 apartments
Residential building in Frankfurt
800 hours
Pole-bar-construction in anodized materials, wood floors, window-profiles, room doors
Residential building in Heilbronn
800 hours
window profile in RAL 7016
Hotel in Berlin
705 hours
421 Hotel room doors
Hotel in Basel
500 hours
Furniture, room doors and duster in tiles
Office building in Frankfurt
277 hours
Doors with pipe-frames
Residential building Hamburg
208 hours
54 Balconies
Hotel in Austria
160 hours
Room furniture in 40 hotel rooms
Cruise ship
129 hours
250 Ceiling angles
Office building in Frankfurt
109 hours
35 Doors with pipe-frames
Office building in Frankfurt
80 hours
Wallshells
Official building in München
64 hours
Wall paneling
Office building in Ascheberg
50 hours
26 Window frames
Residential building in München
77 hours
More than 100 metres of skirtings
Bank building in Frankfurt
Commission over several months
1.000 m2 bog-oak panels
And many successful commissions more…